See the week. See the workload. Make the call.
The question a dispatcher asks forty times a day is not “what is the optimal route”. It is who has room on Thursday — and most boards answer it by making you squint.
Every number on the board is arithmetic you can check
Capacity
How long this person’s working day is, on a day your company works. Configuration — with a per-person override for a part-timer or an apprentice on four days.
Committed
The scheduled minutes of the jobs already on them that day. On a crew job, each person on the roster carries the time — not just the lead.
Open
Capacity minus committed. A day nobody works has no capacity, and says so rather than showing eight hours of imaginary room.
Over
Committed beyond capacity, shown as over-capacity rather than hidden. Overbooking is information, not an error to be silently corrected.
Overlaps
Two jobs at once are reported and left alone. Sometimes that is exactly right — a quick call inside a long install — and only the dispatcher knows which.
Away
Somebody on holiday has no capacity, and the day says Away — vacation. A person who is off should never look like the emptiest person on the board.
There is no travel-time estimate, no route optimisation and no suggested assignment, because a bad version of any of those is worse than the whiteboard it replaced. When Orientra has something genuinely useful to say, it will say it — and until then it will not invent one.
Competency context, at the moment of assignment
If you run both products, the dispatcher sees what Orientra knows about each technician’s competency for the work in front of them — before the truck rolls, not after.
Every technician stays listed and assignable. Those with a competency note are ranked lower and carry the reason. Orientra only prevents an assignment where you have deliberately configured that requirement to block.
How competency worksRescheduling is not a status change. A job can move to a different time without moving through its lifecycle, and moving it never quietly pushes out the response time you promised the customer.
Unplaced work belongs on this screen. The whole point of looking at the week is deciding where the work that has not been scheduled yet is going to go.
Branch and division scoping. A dispatcher in one branch reads their own board, not every board in the company.
See the dispatch board with your own week on it.
Start a 45-day free trial with your own company — no card required — or book a demonstration focused on the workflows that matter to you.